Warehouse Design Specialists
Need Effective Warehouse Design Help...  and Need it Quickly?!
Home   l   About   l   How   l   Customers   l   Articles   l   Publications   l   Services   l   Contact Articles

Recent Client Results

 

We have helped scores of companies like yours to achieve major cost-reduction solutions to their warehouse setup problems.

 SOME ACTUAL CLIENT RESULTS:

  • Doubling pick rates, achieving nearly 100% accuracy and "blind-count" order verification at the same time.
  • Increasing pallet storage by 21%, (in a 1.2 million sq ft W/H) while reducing pallet handling labor by over 50%.
  • Cutting shipping costs by $500,000 annually for an office products company.
  • Achieving manpower savings of as many as 12 workers in one distribution operation.
  • Eliminating the entire 3rd shift and 1/2 the 2nd shift for a famous sporting goods company.
  • Allowing one picker to batch pick as many as 20 orders into their pre-cubed shipping cartons with total verification of accuracy.
  • Doubling case pick productivity while reducing the equipment budget by over $1,000,000.
  • Increasing pallet cube capacity by 210% (with little capital cost to the company) for a metal products mfg.
  • Reducing packing labor by over 100% (with no capital cost) for an internet/catalog health products firm.
     

If you don't find what you need, 
Ask Art aavery@gmail.com 

 

Some Recent Testimonials
(Contact us to speak directly to a writer.)

 

 

"Hi Art, you are very welcome for the references. You may not know this but we RAVE about the suggestions you made to us for our "Distribution Center", and how right your suggestions were…" Dan G., Pres., Pipersville, PA.

 

 

"I look forward to having you involved for our DC implementation plan and in future endeavors as well. Your input was extremely valuable to us". Brent T., President Jacksonville, FL

 

 

"This move is incredibly difficult - I would never have been able to do this without all your great help"! Dave W., Owner, Chicago, IL.

 

 

"First I wanted to say that all your suggestions work great!  Thanks so much.  Secondly, in the later part of May, we will be moving out of our current facility into a new one.  I was wondering if I gave you the layout could you draw up a design.  You told me if there were ever changes, just ask for a new layout, so here I am.  Thanks a lot!"  Bob V., Owner, New Kensington, PA

 

 

"I know it has been a while, but we finally signed on a new building, and are looking at a mid July move.  We have three dock highs, and two roll ups.  Please do your magic and lay out the floor space.  Thanks."  Rami R., Owner, Chatsworth, CA

 

 

"The renovation is going great.  The large shelving is all moved and the small shelving is about 75% in its new location.  A company is coming in Tuesday to build the new shelving...then we can start to relocate all the product.  Thanks for all the help."  Jeff L., Operations Manager, Victoria, BC, Canada.

 

 

"We've received the final report, thanks for the summary of findings and the recommendations.  What was most valuable for us was the process of getting to the goal and the discussions around it…  Thanks again for your help…Joachim S., Systems Manager, New York, NY

 

 

 "I'm proud to say that our first day of production in our new location was March 6.   Thank you for your work on our behalf.  Looks like we got off to a fine start in the warehouse and picking areas.  It's always a pleasure hearing from you."  Charlie T., Project Manager, Amityville, NY

 

The Avery Way   US: (800)-606-9841  FAX: (267) 295-8573   Email: aavery@gmail.com
Copyright 1997-2011 All Right Reserved - Avery and Associates -  The Avery Way